A lot has happened on the construction site since my last post. Time for a quick update and a look behind the scenes of the build.
By now, the electrical installation is almost complete. The finishing work, such as switches and socket cover plates, will be done after the drywall installers finish their work this week. I have to say that everything is running really smoothly! HUF has planned the processes excellently, they're well coordinated and everything simply fits. The site is always left clean and tidy. Very different from what I remember from my apprenticeship.
What's special is that HUF HAUS works with various partner companies that, as a rule, do nothing other than work on HUF's sites - e.g. in the plumbing, electrical or drywall trades.
A look at the electrical work
At this point, I've taken a picture for you of the "heart", so to speak, of the electrical wiring – the control cabinet with the Gira S1. The S1 makes sure that I can later access everything in the house from outside the home network too. What's still missing next to the S1 is the Gira X1. I only recently bought it used on kleinanzeigen.de. Compared with the price new, that saved me almost €300. For the inverter, I bought the SMA Sunny Home Manager 2.0 as well. With it, I can record all energy flows. My plan: to tap all this data later and visualize it in a VM using Grafana.
In addition, the 19-inch network rack is now mounted, and all the network cables have been cut to length. Later, the cables will simply be clipped into the racks via keystone modules. I bought all the network equipment from Serverschrank24.de. The various Ubiquiti equipment is also already on its way and will then be neatly mounted in the rack as well. A small tip: I spent a little more and bought a swing-out network rack. That way, I can easily open it later to get behind the installations. So far, I haven't planned any separate fans in the rack, as I don't expect that much waste heat. The warmest components will probably be the Synology and the Dream Machine.
As you can see in the cover image, the PV system (12kWp) has been installed too. As soon as I've painted the floor in the utility connection room, the house battery (13 kWh) can be installed as well. So far, everything is going very much according to plan. I'll keep you posted. If you have any questions in the meantime, just leave a comment.